RH Fire has been engaged to provide detailed design of the sprinkler and aspirating smoke detection system required by the enabling structure for the new link bridge to connect the library and new archive building. The work also include providing fire protection specification for building consent and tender purposes.

The design of the sprinkler and fire alarm system is developed and completed in 3D. Additionally, RH Fire also provided construction monitoring services which include, reviewing shop drawings/material datasheet/completion documentation, attending workshop meetings and conducting site visit to ensure installation of the fire system are complying with standard and fire protection specification.