top of page
Murphy Building Annex Building Stage 2 Seismic Upgrade
Wellington
RH Fire has developed and delivered performance-based fire protection specification and design sketches for the fire protection system required by the building. These documents outline the initial design framework and addressing the building's fire system performance requirement.
The fire protection system required by the building are sprinkler and fire alarm system.
bottom of page